AMR (Automatic Meter Reading)
- Installation of DCU on Substation with Power, LAN and RS485 cable work. Multi dropped cable loops for DCU to Meters.
- Configuration of DCU with IEC1107 Master, DLMS Slave and ALFA Master Protocol.
- Point to point Testing of DCU for data collection in Meters.
- Configuration of MDAS with DCU and meters addition.
- Validation of Meter data on MDAS and transferred data to the control center over GPRS/OPGW.
- Demonstration of integration to Customers, Conducting Site acceptance test (SAT), training and signing of MOM.